We are proud to be the architects on a major renovation project in Hertfordshire, taking a 1950s property in Hertfordshire and delivering the planning and technical drawings to make the transformation happen.

Prior to work starting on site, our team handled the RIBA Stage 4 Technical Design, which includes:
– The structural coordination for the part two-storey side/rear extension and part single-storey rear extension, including brick detailing features on the front elevation.
– The layouts and fire escape routes following the internal reconfiguration.
– The specifications for walls, roofs, floors and door and window replacements.




See photos for a snapshot of the progress on site. The structural steelwork is complete, we have a preview of the brickwork detailing, and the roof structure taking shape.


Thanks to our clients for collaborating with us and trusting us to bring their vision to life. We’re excited to watch the rest of the build unfold!





